Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.
Which requirement must be met in order to enable vMotion migration between these locations?
Correct Answer:
B
During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment: The Maximum Tolerable Downtime (MTD) for all Tier 1 applications is one hour. Which requirement classification is being gathered for the design documentation?
Correct Answer:
C
An architect is designing a new vSphere environment with the following resources: 600 vCPU
5,760 GB RAM
Average resource usage is: 60 vCPU
1,152 GB RAM
The design must meet the following requirements: The environment has the ability to burst by 25%.
Each host can schedule 36 vCPUs and has 512 GB RAM.
Management overhead is 20%.
What is the minimum number of hosts required to meet the design requirements?
Correct Answer:
D
An architect is reviewing a physical storage design. The customer has specified that a new active-passive based storage array will be used to provide storage for the vSphere clusters.
Which configuration should for the architect recommended?
Correct Answer:
B
A architect is designing a new VMware software-designed data center (SDDC) using vSphere 7 to meet the following requirements: The SDDC must be deployed at two locations: primary and secondary.
vSphere Replication must be used to replicate virtual machines between the two locations.
Site Recovery Manager must be used to orchestrate disaster recovery (DR) activities.
One single-sign on (SSO) domain must be used to authenticate access at both locations. Which design decision should the architect make to meet these requirements?
Correct Answer:
D