00:00

QUESTION 76

Company XYZ wants to use the FCAPS ISO standard for network management design. The focus of the design should be to minimize network outages by employing a set of procedures and activities to detect and isolate network issues and the appropriate corrective actions to overcome current issues and prevent them from occurring again. Which layer accomplishes this design requirement?

Correct Answer: A

QUESTION 77

Drag and drop the end-to-end network virtualization elements from the left onto the correct network areas on the right.
400-007 dumps exhibit
Solution:
Graphical user interface Description automatically generated with medium confidence

Does this meet the goal?

Correct Answer: A

QUESTION 78

A product manufacturing organization is integrating cloud services into their IT solution The IT team is working on the preparation phase of the implementation approach, which includes the Define Strategy step. This step defines the scope of IT, the application, and the service What is one topic that should be considered in the Define Strategy step?

Correct Answer: D

QUESTION 79

While designing a switched topology, in which two options is UplinkFast recommended? (Choose two )

Correct Answer: AD

QUESTION 80

A customer migrates from a traditional Layer 2 data center network into a new SDN-based spine-and-leaf VXLAN EVPN data center within the same location The networks are joined to enable host migration at Layer 2 What is the final migration step after hosts have physically migrated to have traffic flowing through the new network without changing any host configuration?

Correct Answer: D