QUESTION 41

- (Topic 1)
A project that lacks a clear definition of its scope and boundaries runs the risk of:

Correct Answer: E

QUESTION 42

- (Topic 2)
Find the value of (13) in the ANOVA table. Assume:
CSSBB dumps exhibit

Correct Answer: G

QUESTION 43

- (Topic 1)
A management team lists nine goals across the top of a rectangle and 15 activity initiatives along the left hand side of the rectangle. If one of the activities strongly supports one of the goals a circle is placed in the box where that activity’s row intersects the goal’s column. If the activity’s support is very strong a “bulls eye” is placed in the box and if the support is weak a triangle is used. This best describes which problem solving tool?
CSSBB dumps exhibit

Correct Answer: E

QUESTION 44

- (Topic 1)
A team wants a technique for improving consistency of assembly operations. They should use:

Correct Answer: A

QUESTION 45

- (Topic 1)
The primary metric for a project is reduced cost for process A .A consequential metric could be:

Correct Answer: D