QUESTION 26

HOTSPOT - (Topic 7)
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).
MB-335 dumps exhibit
After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)
MB-335 dumps exhibit
You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)
MB-335 dumps exhibit
You need to determine the method to schedule the production lines.
MB-335 dumps exhibit
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 27

HOTSPOT - (Topic 7)
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 28

- (Topic 7)
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
The company requires that employees register time against each machine on the shop floor.
You need to configure the system so that employees can register time.
Which two configurations must be set up? Each answer represents a partial solution NOTE Each correct selection is worth one point.

Correct Answer: AB

QUESTION 29

- (Topic 1)
You need to configure production operations for the pine and orange scent solutions.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

Correct Answer: ADE

QUESTION 30

- (Topic 2)
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

Correct Answer: AC