QUESTION 61

How should a Development Team deal with non-functional requirements?

Correct Answer: A
The correct answer is A, because the Scrum Guide states that “the definition of ‘Done’ is a formal description of the state of the Increment when it meets the quality measures required for the product.” Therefore, non-functional requirements should be part of the definition of ‘Done’ and ensure every Increment meets them.

QUESTION 62

Select two ways in which technical debt impacts transparency. (Choose two.)

Correct Answer: BC
The correct answers are B and C, because technical debt impacts transparency in these ways. It leads to false assumptions about the current state of the system, specifically of an Increment being releasable at the end of a Sprint, as it may contain hidden defects or incomplete functionality. It also results in future work being slowed down in unpredictable ways, as development progresses and code is added, the system becomes more difficult to stabilize and maintain.

QUESTION 63

What is the timebox for a Sprint Planning event? (choose the best answer)

Correct Answer: B
According to the Scrum Guide, the timebox for a Sprint Planning event is 8 hours for a one-month Sprint, proportionally shorter for shorter Sprints. The other options are not valid, as they are either too long (such as monthly), too vague (such as whenever it’s done), or too short (such as 4 hours for a one-month Sprint).

QUESTION 64

A Scrum Master is introducing Scrum to a new Team. The Team has decided that a Sprint Retrospective is unnecessary. What action should the Scrum Master take?
(choose the best answer)

Correct Answer: B
According to the Scrum Guide, the action that the Scrum Master should take when the Team decides that a Sprint Retrospective is unnecessary is to begin facilitating productive and useful Sprint Retrospectives. The Sprint Retrospective is an essential event for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint. The Scrum Master is responsible for ensuring that this event takes place and that positive outcomes are achieved. The other options are not valid actions, as they either imply that the Scrum Master complies with or ignores the decision of the Team (such as complying with it, calling a meeting with senior management, or consulting with the Product Owner), which is not consistent with Scrum values and principles.

QUESTION 65

Who must attend the Daily Scrum?

Correct Answer: D
According to the Scrum Guide1, the Daily Scrum is an event for the Developers of the Scrum Team. The purpose of the Daily Scrum is to inspect progress toward the Sprint Goal and adapt the Sprint Backlog as necessary, adjusting the upcoming planned work. The Scrum Master and Product Owner may attend as observers, but only if it is useful for the Developers.
References: Scrum Guide