Which of the following should be done when closing an incident?
1: Check the incident categorization and correct it if necessary
2: Check that the user is satisfied with the outcome
Correct Answer:
B
What is the BEST description of the purpose of the service operation stage of the service lifecycle?
Correct Answer:
D
There are four types of metrics that can be used to measure the capability and performance of processes. Which of the four metrics is missing from the list below?
1: Progress
2: Effectiveness
3: Efficiency
4: ?
Correct Answer:
C
Which of the following is MOST concerned with the design of new or changed services?
Correct Answer:
D
Which is the BEST definition of a Configuration Item (CI)?
Correct Answer:
C