QUESTION 121

- (Exam Topic 3)
Which of the following project team members is responsible for managing quality assurance?

Correct Answer: C
Reference: https://www.pm4dev.com/pm4dev-blog/entry/who-is-responsible-for-project-quality.html

QUESTION 122

- (Exam Topic 3)
The project team has identified all the tasks needed to create project deliverables and grouped them into work packages covering all project scope. Which of the following should be done NEXT?

Correct Answer: D

QUESTION 123

- (Exam Topic 3)
A project team decides to obtain a support contact on one of the hardware infrastructures being used on the project. This is to ensure the project is grounded if an issue with the hardware occurs during the course of the project.
This type of risk response is known as:

Correct Answer: A
You’ll use several strategies when determining both negative risks and opportunities and formulating your response plans. The strategies to deal with negative risks include the following:
Avoid: Avoiding the risk altogether or eliminating the cause of the risk event
Transfer: Moving the liability for the risk to a third party by purchasing insurance, performance bonds, and so on Mitigate: Reducing the impact or the probability of the risk Accept: Choosing to accept the consequences of the risk

QUESTION 124

- (Exam Topic 3)
Which of the following would be captured in a risk register?

Correct Answer: D

QUESTION 125

- (Exam Topic 3)
Rather than sending emails to communicate all project information, the project manager:
PK0-004 dumps exhibit Makes telephone calls to key stakeholders for urgent information
PK0-004 dumps exhibit Sends emails for routine information
PK0-004 dumps exhibit Posts on the project intranet site for required but minimally used information Which of the following BEST represents what the project manager is doing?

Correct Answer: B